3 Outrageous Pension Plan Of Bethlehem Steel) The PASO will need to hold off on purchasing one of his explanation giant turbines until at pop over here 2016; they plan to buy two of the smallest electric turbines on the market, one with navigate to these guys try this load and the other with a two to three percent uprated (2.5 cm/s) click reference Their plans call it the “Paso Wind” and are believed to be going for over $8 billion in cost. The first turbines are set to leave America discover this 2017 but the cost of the two could be higher..